CLiREN-LMS
Final Project Preparation, Presentation, and Course Integration

Purpose of the Final Project

12.1 Purpose of the Final Project

30-45 minutes Applied Step 3 of 7
Reading 1

12.1 Purpose of the Final Project

3 / 7
The final project is the capstone of the course. Its purpose is to bring together the major skills developed across the previous chapters: protocol interpretation, CRF design, REDCap database development, validation rules, data entry workflow, data quality management, R-based cleaning, descriptive analysis, visualization, reporting, documentation, and governance. The project should demonstrate not only that the learner can use tools, but that they can use them responsibly within a clinical research data management workflow. The final project should be small enough to complete but realistic enough to show professional judgment. A suitable project may be a mock clinical cohort, a registry prototype, a small trial database, a laboratory-linked observational study, or a monitoring workflow for a sample REDCap project. The project should include a clear study scenario, a defined dataset, a database or data dictionary, quality checks, R scripts, at least one report, and documentation. The project is not expected to be a full production system. Instead, it is a demonstration of competence. The learner should show that they can translate requirements into data structures, protect raw data, write reproducible scripts, produce meaningful outputs, and explain decisions.
Project elementExpected evidence
Study scenarioShort description of study aim, population, and key data
CRF or data dictionaryVariables, labels, field types, choices, validation
REDCap build or mock buildForms, identifiers, access considerations, test records
Data quality planKey checks, query logic, priority fields
R cleaning scriptImport, cleaning, derivations, query outputs
Descriptive summaryTables for enrollment, completeness, and key variables
VisualizationAt least one monitoring plot
ReportReproducible report or structured output
DocumentationREADME, codebook, limitations, governance notes
**Figure 12.1 Placeholder: Final project deliverable map.** This figure should show how protocol requirements connect to CRF design, REDCap build, data export, R scripts, reports, dashboards, and documentation.