Longitudinal Projects and Events
Overview
Overview
1 / 7
Overview
Longitudinal projects are used when data are collected from the same participant or unit at multiple scheduled timepoints. REDCap implements this structure using events. An event represents a visit, phase, or timepoint, such as Screening, Enrollment, Day 7, Day 28, Month 6, or Close-out. Instruments can be assigned to events so that the same form can be completed at multiple timepoints.