Longitudinal Projects and Events
Key Idea
Callout
4 / 7
Key Idea
Callout
Key Idea
Longitudinal projects are used when data are collected from the same participant or unit at multiple scheduled timepoints. REDCap implements this structure using events. An event represents a visit, phase, or timepoint, such as Screening, Enrollment, Day 7, Day 28, Month 6, or Close-out. Instruments can be assigned to events so that the same form can be completed at multiple timepoints.